- Replaced position transducer
- 2020 resealed inj; unit
- 2017 resealed clamp
- Replaced board and monitor in 2018
- Replaced a valve in 2016
- FLI 49A
- Replaced the feed throat water manifold, new oil filter, and water connector nipples.
- Screw & barrel professionally switched last summer and ran polyester material through it for 30 hours before the seal blew.
- New clamp seal set with new tension rods that are part of the deal.
- Hours 49,307